Airport Master Plan

Gold Coast Airport 2011 Master Plan

The draft Gold Coast Airport 2011 Master Plan was approved by the Federal Minister for Infrastructure and Transport, the Hon Anthony Albanese MP on 14 May 2012, following extensive consultation with the community and other key stakeholders. The draft has since been finalised, in consultation with the Federal Department of Infrastructure and Transport, and is now available to the public as a final 2011 Master Plan.

Changes to the preliminary draft 2011 Master Plan, arising from written comments received during the 60 day public comment period (September 2011 – December 2011) have been incorporated into the final 2011 Master Plan. The key changes that have occurred are within the following sections of the document:

3.0 Forecast Growth- Performance and Assumptions ( FIFO operations)

6.4 Consistency with Surrounding Planning Legislation –Surrounding Land use

7.2.2 Development Concept – Aprons

7.2.2 Development Concept – Western Enterprise Precinct

7.3 Terminal Development – Development Concept (Aerobridges)

8.4 Sensitive Development – Southern Cross University

10.0 Aviation Services and Utilities

12.0 Noise Exposure

13.0 Environment

14.0 Implementation

The final 2011 Master Plan details how Gold Coast Airport is planned to develop over the next twenty years to 2031, including the forecast growth and facilities required to accommodate this growth. This Master Plan specifically focuses on the development requirements of the airport over the next five years. The Master Plan is a strategic document that is used as a guide for the development of airport facilities, assessment of environment effects, development of land use controls, and establishment of airport access requirements to meet the future requirements of the aviation industry and the community it serves.

The final 2011 Master Plan can be downloaded free of charge from this web site. Due to the size of the overall document, specific chapters can be individually downloaded if required.

Copies can be viewed in the Gold Coast City and Tweed Shire libraries.

Printed copies can also be viewed and are available for purchase for $25 each (including GST and postage) from the:

Gold Coast Airport Management Centre

Level 1 Airport Central building

1 Eastern Ave Bilinga QLD 4225

Click here to download the complete Gold Coast Airport 2011 Master Plan. (*please note this is a 20mb document)

Alternatively, please refer to the below chapters which may be downloaded separately:

Cover Foreword Contents

Executive Summary

1.0 Introduction

2.0 The Master Plan

3.0 Forecast Growth

4.0 Economic Regional Significance

5.0 Community Stakeholder Engagement

6.0 Land Use

7.0 Aviation Development

8.0 Non-Aviation Development

9.0 Ground Transport Plan

10.0 Aviation Services Utilities

11.0 Airspace Protection

12.0 Noise Exposure

13.0 Environment

14.0 Implementation

Appendices


Sorry, comments for this entry are closed at this time.


Gold Coast Airport on Facebook Gold Coast Airport on Instagram Gold Coast Airport on Twitter